Task 1: The two maps below show road access to a city hospital in 2007 and in 2010.
Summarize the information by selecting and reporting the main features and make comparison where relevant.
The maps illustrate some changes that were made to a city hospital’s transport infrastructure between the years 2007 and 2010.
It is noticeable that three main modifications were made to the hospital’s vehicle access. These involved the building of a new bus station, new roundabouts and new parking facilities.
Looking at the changes in more detail, we can see that in 2007 there were three bus stops on either side of Hospital Road. These were no longer present in 2010, and instead we see the addition of a bus station on the west side of Hospital Road. This bus station is accessed via two new roundabouts; the first roundabout is at the intersection of City Road and Hospital Road, while the second is at the other end of Hospital Road, at the junction with the hospital ring road.
The two maps also show that changes were made to public and staff parking areas. In 2007, staff and visitors used the same car park, which was situated to the east of Hospital Road and accessed via the ring road. However, by 2010 this original car park had become a designated area for staff parking only. A new car park, located on the east side of the ring road, provided parking for members of the public.
Tham khảo chi tiết chương trình tiếng Anh IELTS ở ETEST và để nhận lộ trình học IELTS cá nhân hóa phù hợp với mục tiêu và kiểm tra IELTS miễn phí tại Anh Ngữ Du Học ETEST
CÔNG TY CỔ PHẦN ANH NGỮ ETEST
Anh Ngữ Du Học ETEST Quận 3: Lầu 3, 215 Nam Kỳ Khởi Nghĩa, Phường Võ Thị Sáu, Quận 3
Anh Ngữ Du Học ETEST Quận 7: Lầu 6, 79-81-83 Hoàng Văn Thái, Phường Tân Phú, Quận 7
Anh Ngữ Du Học ETEST Đà Nẵng: Số 9, Đường C2, Khu Đô Thị Quốc tế Đa Phước, P. Thanh Bình, Q. Hải Châu, TP. Đà Nẵng
Hotline: 0933.80.66.99 (Q.3)/ 0937.80.66.99 (Q.7)/ 0936.17.76.99 (Đà Nẵng)
Website: https://etest.edu.vn/